FAQ
You are here:Home >> News >> FAQ
What is the difference between a DC charging pile and an AC charging pile
1160 2022-03-21
  The charging pile is fixed on the ground, uses a special charging interface, and adopts the conduction method to provide AC power for electric vehicles with on-board chargers, and has corresponding communication, billing and safety protection functions. Citizens only need to buy an IC card and recharge, and then they can use the charging pile to charge the car.
1. Charging principle of charging pile
  The charging pile is fixed on the ground, uses a special charging interface, and adopts the conduction method to provide AC power for electric vehicles with on-board chargers, and has corresponding communication, billing and safety protection functions. Citizens only need to buy an IC card and recharge, and then they can use the charging pile to charge the car.
After the battery of the electric vehicle is discharged, direct current is used to pass through the battery in the opposite direction to the discharge current to restore its working capacity. This process is called battery charging. When charging the battery, the positive pole of the battery is connected to the positive pole of the power supply, and the negative pole of the battery is connected to the negative pole of the power supply. The charging power supply voltage must be higher than the total electromotive force of the battery.
2. There are two charging modes: constant current charging and constant voltage charging.
Constant current charging method:
  The constant current charging method is a charging method that keeps the charging current intensity unchanged by adjusting the output voltage of the charging device or changing the resistance in series with the battery. The control method is simple, but because the acceptable current capacity of the battery gradually decreases with the charging process, in the later stage of charging, the charging current is mostly used for electrolyzing water, generating gas, and making the gas out too much. Therefore, the stage charging method is often used.
Constant voltage charging method:
  The voltage of the charging power supply maintains a constant value throughout the charging time, and as the battery terminal voltage gradually increases, the current gradually decreases. Compared with the constant current charging method, the charging process is closer to the optimal charging curve. For fast charging with constant voltage, since the electromotive force of the battery is low in the early stage of charging, the charging current is very large, and the current will gradually decrease as the charging progresses, so only a simple control system is required.
3. The difference between DC charging piles and AC charging piles
DC charging pile:
  The DC electric vehicle charging station, commonly known as "fast charge", is a power supply device that is fixedly installed outside the electric vehicle and connected to the AC power grid to provide DC power for the off-board electric vehicle power battery. The input voltage of the DC charging pile adopts three-phase four-wire AC380V±15%, the frequency is 50Hz, and the output is adjustable direct current, which directly charges the power battery of the electric vehicle. Since the DC charging pile adopts a three-phase four-wire system for power supply, it can provide sufficient power, and the output voltage and current adjustment range is large, which can meet the requirements of fast charging.
AC charging pile:
  AC electric vehicle charging pile, commonly known as "slow charge", is a power supply device that is fixedly installed outside the electric vehicle and connected to the AC power grid to provide the AC power supply for the electric vehicle on-board charger (that is, the charger that is fixedly installed on the electric vehicle). The AC charging pile only provides power output and has no charging function. It needs to be connected to the on-board charger to charge the electric vehicle. It is equivalent to just playing the role of a control power supply.
  The difference between the two: In simple terms, the AC charging pile needs to be charged with the help of an on-board charger, and the DC fast charging pile does not need this equipment. The charging speed of the two is quite different. It takes 8 hours for a pure electric vehicle (ordinary battery capacity) to be fully discharged through an AC charging pile, while it only takes 2 to 3 hours to pass through a DC fast charging pile. The AC charging pile provides power input to the charger of the electric vehicle. Since the power of the on-board charger is not large, fast charging cannot be achieved. The DC fast charging pile is a power supply device that is fixedly installed outside the electric vehicle and connected to the AC power grid, and can provide DC power for the power battery of the non-vehicle electric vehicle. The DC charging pile can provide sufficient power, and the output voltage and current can be adjusted in a wide range. , can meet the requirements of fast charging.
主站蜘蛛池模板: 97超级碰碰碰久久久久app| 精品少妇人妻av无码久久| 亚洲人成网站在线观看播放| 99久久亚洲精品日本无码| 久久99精品久久久久久| 67194成是人免费无码| 久久青青草原精品国产| 国产97在线 | 日韩| 精品国产午夜福利在线观看| 日韩人妻精品一区二区三区视频| 国产吃奶在线观看| 亚洲精品国产成人无码区a片| 亚洲综合久久无码色噜噜| 高清同性男毛片| 天天爽天天狠久久久综合麻豆 | 色悠久久久久久久综合网| 国产精品爽爽久久久久久| 午夜在线欧美蜜桃| 黄网站色视频免费观看| 换脸国产av一区二区三区| 无码人妻丰满熟妇区96| 性xxxx视频播放免费| 国产偷国产偷高清精品| 青青草视频在线观看| 18禁亚洲深夜福利人口| 精品三级久久久久电影网| 欧美成人猛交69| 日韩一区二区三免费高清| 亚洲乱码国产乱码精品精| 人人爽人人爽人人片a| 亚洲熟妇av一区二区三区漫画 | 欧美综合天天夜夜久久| 青青青国产免费线在| 中文字幕精品一区二区2021年| 天天狠天天透天干天天| 亚洲欧洲日产国产 最新| av中文字幕无码免费看| 精品无码国产av一区二区三区| 夜夜添无码一区二区三区| 国产精品美女久久久久久福利 | 人妻熟女av一区二区三区|